Welders
Welders homologated to UNE-EN ISO 9606, ISO 14732 and ASME IX, fluent in MIG/MAG, TIG, stick and flux-cored processes for industrial shutdowns and assemblies across Spain.

How we deliver it
Iron Pulse mobilizes homologated welders for shutdowns, assemblies and industrial work across Spain — from the Tarragona petrochemical hub to the naval yards of Cadiz and Ferrol. Every profile clears document screening and a practical test before heading to the work front.
We cover the usual industry processes — MIG/MAG, TIG, stick and flux-cored — on carbon steel, stainless, duplex and nickel alloys. Positions PA to PF (equivalent to 6G), with WPS validated for pressure vessels (ASME IX), steel structures (EN 1090, AWS D1.1) and high-pressure piping.
Speed is our angle: we mobilize the pool within 48 to 72 hours to any complex or industrial estate in the country. Clients get full traceability — WPS, WPQR, UNE-EN ISO certificates and a photo report when the front closes.
What this crew covers
MIG/MAG, TIG, stick and flux-cored processes
Positions PA to PF (equivalent to 1G through 6G)
Homologated to UNE-EN ISO 9606-1, 9606-5 (titanium) and ISO 14732 (mechanized processes)
Procedures to EN 1090 and AWS D1.1 (structural) and ASME IX (pressure vessels)
Carbon steel, 304/316 stainless, duplex and nickel alloys
Pre- and post-weld heat treatment per WPS
Visual (VT) and dimensional inspection included
Optional level 2 welding inspector oversight (NDT)
PRL current: work at height, confined spaces and occupational medical clearance
Final dossier with photos, WPS, WPQR and homologation certificates
Where we operate
Sectors and environments where Iron Pulse has deployed crews in this category.
Why choose Iron Pulse
48–72 h mobilization
A pool of homologated welders active across Spain, ready for urgent shutdowns at any complex.
Traceable documentation
WPS, WPQR, UNE-EN ISO certificates and occupational medical clearance delivered digitally before arrival on site.
Verified homologation
Coupons and qualifications checked against UNE-EN ISO 9606 before each front — no surprises in the field.
Inspection support
Level 2 welding inspector and NDT (RT, UT, PT, MT) available to match the job requirements.
Need welders for your project?
Tell us the scope and the timeline and we will send back a tailored proposal within one business day.
Request a quote